Uploaded image for project: 'Records Management'
  1. Records Management
  2. RM-4611

Policy Notification on Record Declaration

    Details

    • Type: Story
    • Status: Closed
    • Resolution: Done
    • Affects Version/s: None
    • Fix Version/s: RM 2.5.2
    • Component/s: None
    • Labels:
    • Work Funnel:
      Feature
    • Sprint:
      Flamebird 11 - Mr. Sinister
    • Story Points:
      3
    • Release Date:
      31-Jul-2017
    • Work Funnel End:
      2017-05
    • Execution Order Weight:
      0

      Description

      Story

      As a developer
      I want to be able to receive policy notification when content is declared as a record
      So that I can take appropriate action based on this change of state

      Acceptance Criteria

      Given content that is not already a record
      When I declare the content as a record
      Then a policy notification is triggered before the content is declared as a record with the contents node reference

      Given content that is not already a record
      When I declare the content as a record
      Then a policy notification is triggered after the content is declared as a record the content's node reference

      Notes

      • It may already be possible to detect this event by listening to the records management event policy, but we should add this specific policy notification at the service level to ensure all executions are triggered.
      • Other record creation/update policy notifications are out of scope for this story, but should be considered when implementing the solution.

      Sizing video:
      https://ts.alfresco.com/share/s/Q5c5qYleRtqPAxiw5eu9LA

        Attachments

        1.
        Add policy notification Sub-task Closed Unassigned  
        2.
        Review Acceptance Criteria Sub-task Closed Unassigned

        0%

        Original Estimate - 2 hours
        Time Not Required
        3.
        Exploratory Testing Sub-task Closed Unassigned

        0%

        Original Estimate - 4 hours
        Time Not Required
        4.
        Integration Tests Sub-task Closed Unassigned

        0%

        Original Estimate - 1 day
        Time Not Required

          Structure

            Activity

              People

              • Assignee:
                Unassigned
                Reporter:
                royw Roy Wetherall
              • Votes:
                0 Vote for this issue
                Watchers:
                3 Start watching this issue

                Dates

                • Created:
                  Updated:
                  Resolved:

                  Time Tracking

                  Estimated:
                  Original Estimate - 1 day, 6 hours
                  1d 6h
                  Remaining:
                  0m
                  Logged:
                  Time Not Required
                  Not Specified

                    Structure Helper Panel